Project Experience
Project Experience in Complex Electrical System Integration
In over two decades of delivering complex electrical distribution systems, Paradigm has completed numerous projects that showcase our expertise. Below are details of our project experience, highlighting the foundation of Paradigm’s deliverables. Each project involved integrating a wide range of products, including both MV and LV Switchgear, Large Horsepower Variable Frequency Drives, LVMCC, and other station and site service equipment. These systems are used to deliver power to various lift stations along some of America’s Largest and Longest Pipelines.
Garden Creek Project Experience
The Garden Creek gas processing plant required the integration of multiple MV VFDs with synchronous bypass, ensuring precise motor control and energy efficiency. The system included extensive gear lineups, PLCs, and UPS systems housed within PDCs, showcasing Paradigm’s ability to manage highly complex projects.
Power Distribution Centers (5).
2000 HP MV VFDs (6).
15 kV Transformers (6).
5 kV Transformers (6).
MV MCCs (6).
LV MCC Sections (200+).
UPS Systems (5).
Bus Ducts (6).
Eagle Ford Project Experience
In Eagle Ford, Paradigm successfully delivered and integrated six PDCs equipped with a total of 53,000 HP in VFDs. The project ensured seamless operation across multiple stations, supported by switchgear, MCCs, and PLC systems.
Power Distribution Centers (6).
3500 HP MV VFDs (12).
2500 HP MV VFDs (2).
1000 HP MV VFDs (6).
Switchgear Lineups (2000–3000 amp) (6).
MV MCCs (6) & LV MCCs (6).
UPS Systems (6).
PLC Systems (6).
5 kV Bus Ducts (8).
Transformers (9).
Texas Express Project Experience
Texas Express showcased Paradigm’s ability to manage tight schedules and budgets while delivering high-performance systems. The project involved five PDCs with large MV VFDs and complete electrical distribution solutions.
Power Distribution Centers (5).
2000 amp Switchgear Lineups (5).
3000 HP MV VFDs (10).
1500 HP MV VFDs (2).
MV MCCs & (5) LV MCCs (5).
UPS Systems (5).
Plains Basin Project Experience
For the Plains Basin project, Paradigm delivered eight PDC buildings housing large MV VFDs, MCCs, and UPS systems. Thus, ensuring efficient power management under demanding operational conditions.
Power Distribution Centers (8).
3000 HP MV VFDs (6).
1500 HP MV VFDs (3).
MV MCCs (8) & LV MCCs (8).
UPS Systems (8).
Seaway Reversal & Seaway II
The Seaway projects demanded high-capacity systems, including 6000 HP VFDs, advanced MCCs, and MV switchgear. Paradigm met every requirement for quality, safety, and schedule adherence.
Seaway II:
Power Distribution Centers (6).
6000 HP MV Drives (some supplied to another PDC manufacturer) (26),
2500 HP Drives (4).
1000 HP Drives (2).
MCCs with Sync Transfer (15).
MV Switchgear Lineups (6).
Seaway Reversal:
Power Distribution Centers (2).
3500 HP Drives with Sync Bypass (2).
1000 HP Drives (2).
MV Switchgear (1).
MV MCC (1).
Garden Creek
- (5) Power Distribution Centers
- (6) 2000 HP MV VFDs
- (6) 15 kV Transformers
- (6) 5kV Transformers
- (6) MV MCCs
- (200+) sections of LV MCCs
- (5) UPS Systems
- (6) Bus Ducts
Texas Express
- (6) Power Distribution Centers
- (10) 2000 HP MV VFDs
- (2) 1000 HP MV VFDs
- (6) MV MCCs
- (6) LV MCCs
- (6) UPS Systems
Eagle Ford
- (5) Power Distribution Centers
- (6) 2000 HP MV VFDs
- (6) 15 kV Transformers
- (6) 5kV Transformers
- (6) MV MCCs
- (200+) sections of LV MCCs
- (5) UPS Systems
- (6) Bus Ducts
Plains Basin
- (8) Power Distribution Centers
- (6) 3000 HP MV VFDs
- (3) 1500 HP MV VFDs
- (8) MV MCCs
- (8) LV MCCs
- (8) UPS Systems
Seaway Reversal & Seaway II
- (4) Power Distribution Centers
- (27) 6000hp MV Drives
- (4) 2500hp Drives
- (8) 1000hp Drives
- (13) MCC’s with Sync Transfer
- (4) Lineups – Switchgear feeding